Discipline
BIM Consultancy
Headquarters
Washington, DC
Studio
Cairo, Egypt
Index
00% — Sheet 01
Technology for Design + Construction.

We build the information, not just the model — structured, verified building data that gives design and construction teams better project control.

Request a scope

Information, not pictures.

Most teams render 3D pictures. We architect usable data. Every model we deliver is structured, verified, and coordinated — built to carry through the full project lifecycle, from field capture to digital handover.

/ 01  Capabilities

What we do.

01

Scan-to-BIM &
Revit Modeling

Point cloud to precision. We translate raw field conditions and laser-scan data into information-rich Revit models that mirror reality to tolerance.

Deliverable
Revit · LOD 200–400Point cloud registration
02

Coordination &
Clash Detection

Clash conditions, caught early. We verify model alignment and spatial clearances across disciplines so conflicts surface on screen — never on site.

Deliverable
Clash matrix · BCFFederated model
03

Quality &
Digital Handover

Audited against project standards and delivered as clean, structured data — ready for facilities teams, not just for record.

Deliverable
QA report · COBieDigital handover set
/ 02  Workflow

Five calibrated steps.

01

Capture

On-site laser scanning and point-cloud acquisition of existing field conditions.

02

Model

Revit authoring to the agreed level of development, true to the captured data.

03

Coordinate

Federated clash detection across architectural, structural, and MEP systems.

04

Verify

Quality audit against project standards, tolerances, and naming conventions.

05

Deliver

Structured digital handover — models, drawings, and asset data in one package.

/ 03  Why it matters

Better project control, by design.

Reducing assumptions is the whole point — every deliverable is built to remove doubt before it reaches the field.

A

Fewer assumptions

Verified field data replaces guesswork, so decisions get made on what's actually there.

B

Reduced RFIs

Structured, coordinated models collapse the volume of costly requests for information.

C

Early risk visibility

Clash conditions and tolerance issues surface long before they reach the field.

D

Smoother coordination

A single federated source of truth keeps every discipline aligned to the same model.

/ 03.1  Measured outcomes
Representative figures — replace with verified project data
38%
Average reduction in RFIs across coordinated projects
2,400+
Clash conditions resolved before construction began
3.2M
Square feet captured as registered point-cloud data
2
Studios, one continuous team — DC ↔ Cairo
/ 04  Studios

Two studios.
One team.

Headquarters

Washington
DC

38.8951° N — 77.0364° W
EST · UTC−05:00
hello@bldginfolab.com
Studio

Cairo
Egypt

30.0444° N — 31.2357° E
EET · UTC+02:00
cairo@bldginfolab.com
/ 05  Start here

Start with better
information.

Building information for smarter delivery
Request a scope